资源
LAVC has published several documents related to the college's Bond building projects. The following links provide more detailed information on its various Master Plans, its Environmental Impact Reports, and the LAVC Campus Design Standards.
ENVIRONMENTAL IMPACT REPORT
Environmental Impact Report:
- 封面 [PDF: 141 kb]
- 执行概要 [PDF: 175 kb]
- 目录表 [PDF: 88 kb]
- Summary [PDF: 1.1MB]
- 汇总表 [PDF: 184 kb]
- Chapter 1 – Introduction [PDF: 145 kb]
- Chapter 2 – Project Description [PDF: 1.3MB]
- Chapter 3 – Environmental Settings, Impacts & 缓解措施 [PDF: 6.6MB]
- Chapter 4 – Alternatives [PDF: 146 kb]
- Chapter 5 – Impact Overview [PDF: 327 kb]
- Chapter 6 – Bibliography [PDF: 100 kb]
- Chapter 7 – Persons and Organizations Consulted [PDF: 63 kb]
- Chapter 8 – List of Preparers [PDF: 76 kb]
- Chapter 9 – Response to Comments on the Draft EIR [PDF: 12.9MB]
- 附录 [PDF: 33 kb]
Environmental Impact Report - 2011 Addendum & 评论:
- EIR Addendum Memo (March 2011) [PDF: 12.1MB]
- Response to EIR Comments – Updated 03-16-11 [PDF: 10.6MB]
Exterior Lighting Master Plan [PDF: 27.9MB]
Measure J - Stormwater Master Plan [PDF: 16.7MB]
Measure J - Utility Master Plan [PDF: 43.4MB]
- LAVC城市森林 Master Plan 2011 [PDF: 81 mb]
- 树艺家库存 [PDF: 142 kb]
- 城市森林地图 [PDF: 1.3MB]
LAVC Central Plant Study [PDF: 8.7 MB]
- Campus Design Standards - 封面 [PDF: 111 kb]
- 目录表 [PDF: 116 kb]
- 关于 Campus Standards [PDF: 111 kb]
- Design Criteria / Requirements (邮政编码:9.6MB]
- Division 2 - Site Work (邮政编码:233 kb)
- Division 3 - Concrete (邮政编码:24 kb)
- 第四部门-砖石工程 (邮政编码:7 kb)
- 第五部-金属 (邮政编码:20 kb)
- 第六分区-森林 & 塑料 (邮政编码:27 kb)
- 第八部-门 & 窗户 (邮政编码:315 kb)
- Division 10 - Specialties (邮政编码:14.2MB]
- Division 12 - Furnishings (邮政编码:124 kb)
- Division 14 - Conveying System (邮政编码:88 kb)
- Division 15 - Mechanical (邮政编码:4.2MB]
- Division 16 - Electrical (邮政编码:2.8MB]